Fence Post Concrete Calculator

Calculate **concrete needed** for fence post holes with volume and bag count. **Concrete calculator** for post footings with displacement calculations.

Formula & Explanation

Concrete volume for each post hole is calculated as a cylinder minus the post volume: Hole volume = π × r² × depth - Where r = hole_diameter_inches ÷ 24 (convert to feet) Post volume = post_width² × depth - Post approximated as a square prism Net concrete per hole = hole_volume - post_volume Total concrete = concrete_per_hole × number_of_posts Bags (80 lb) = ceil(total_concrete ÷ 0.6) - One 80 lb bag of concrete yields approximately 0.6 cubic feet Waste percentage accounts for spillage, uneven holes, and over-ordering.

Assumptions

  • One-time calculation per fence project (not recurring)
  • Post holes are cylindrical (round holes have minimum volume)
  • Concrete yields approximately 0.6 cuft per 80 lb bag (standard)
  • Post is approximated as a square prism for volume displacement
  • Hole depth is measured from ground level to bottom (not including above-ground height)
  • Waste percentage 5-10% for typical installation (add more for uneven terrain)
  • Does not include reinforcement rebar, wire mesh, or concrete sealer

Example Calculation

A 100-foot fence with 14 posts (8-foot spacing) and 12-inch diameter holes at 2.5-foot depth requires 1.24 cubic feet of concrete per hole. Total: 17.36 cubic feet (0.64 cubic yards) or approximately 30 bags of concrete. With 10% waste, order 33 bags.

Inputs

fenceLength:100
postSpacing:8
holeDiameter:12
holeDepth:2.5
postWidth:4
wastePercent:10

Results

postCount:14.00
concretePerHole:1.24
totalConcreteCuft:17.36
totalConcreteCuyd:0.64
bagsWithoutWaste:30.00
bagsWithWaste:33.00

Common Post Hole Specifications

postTypeholeSizedepthconcrete
4×412" diameter2-2.5 ft1.2-1.5 cuft
4×412" diameter3 ft1.5-1.8 cuft
6×618" diameter2.5 ft2.0-2.5 cuft
6×618" diameter3 ft2.5-3.0 cuft